When will you remove the barriers?

There could be several reasons why barriers are left on site:

  • If the hole is still open: This may mean that further investigation is required, or that problems have delayed backfilling the hole.
  • If the hole is backfilled: We try and operate a "first time permanent reinstatement" system, which means we’ll repair the leak and reinstate the ground to a permanent level within a few days. This saves on materials and helps to reduce our carbon footprint