Results for: Water fittings notification form

Search publications

Water fittings notification form

Use this form to notify us of a change of plumbing installation under the Water Fittings Regulation 5.

Download/View

Water Supply (Water Fittings) Regulations 1999 - what they are and how they affect you

This leaflet by WRAS that provides information about the Water Supply (Water Fittings) Regulations and how they affect you.

Download/View

Pre-development enquiry form

Use this form to enquire about the likely cost of water services for your development.

Download/View

Nominee consent form

Use this form if you would like someone else to discuss and manage your account with South Staffs Water.

Download/View

Keeping water safe in premises - WRAS policy

Water Industry policy for the enforcement of the Water Supply (Water fittings) Regulations by WRAS.

Download/View

Meter application form

Standpipe application form

Contaminated land assessment form

Asset records request form

WaterSure Application Form

SPRING Application Form

Drought plan 2021 appendix D - consistent form of notice for Temporary Use Ban

In the event of a Temporary Use Ban, we propose to adopt a consistent form of notice and this is presented in this document.

Download/View

Surface Water Drainage

Water company lay application

Miscellaneous Water Charges 2024/25

Water Resources Management Plan

Code of Practice for household customers 2023/24 - Water pipes

Keeping water safe in premises

Water use in the home

Looking after water in the home

Advice on how to look after the water in your home from WRAS and Water UK

Download/View

Water reuse systems

Guidance and advice on water reuse systems provided by Water UK and the Home Builders Federation.

Download/View

Water main diversion application

If you need us to relocate our water mains to facilitate your development, you will need to apply for a water main diversion.

Download/View

WRE water resources triangulation

Report covering a synthesis of all insights related to WRMPs across Water Resources East water companies – published August 2022

Download/View

WRW water resources triangulation

Report covering a synthesis of all insights related to WRMPs across Water Resources West water companies – published April 2023

Download/View

South Staffs Water PR14 Reconciliations

Installing water supply pipes

Developer services info sheet 1 - requirements for installing water supply pipes.

Download/View

Replacement water supply application

Application for 25mm separation of existing shared supply or replacement water connection

Download/View

Water use in your business

Water is a valuable resource, yet all too often we take it for granted. Whether your business is large or small it will benefit from using water efficiently.

Download/View

SSC17 South Staffs Water: Estimates of Water Poverty

Research conducted into our regions by CEPA to determine the levels of water poverty we need to tackle.

Download/View

Assure Tariff Application Form

This is a special tariff that can help some customers on low income pay their bill. If you're eligible and your application is successful, your charges will be discounted for 2 years, in the first by 60% and the second year by 40%.

Download/View

Code of Practice for household customers 2023/24 - Water services we provide

Notice of Application for Water Services and Sewerage Services Licences

Notice of Application for Water Services and Sewerage Services Licences.

Download/View

Water Resources Management Plan - Annual Review 2017

Water Resources Management Plan Annual Review 2016

Revised draft water resources management plan 2024

Garden Water Behaviours study

Report covering findings from engaging customers around their water uses in outdoor spaces – published October 2022

Download/View

Water meter relocation policy

Moving your water meter isn’t standard DIY. This policy tells you what you need to do if you want to move your meter.

Download/View

SSC01Securing your water future – South Staffordshire Water’s business plan 2025-2030

SSC01Securing your water future – South Staffordshire Water’s business plan 2025-2030.

Download/View

SSC34 South Staffs water revised draft WRMP24

Our draft water resources management plan for the South Staffs region.

Download/View

SSC35 Cambridge Water revised draft WRMP24

Our draft water resources management plan for the Cambridge region.

Download/View

SSC04d PR24 Data tables commentary – Water resources

A commentary on data in the ‘Water resources’ section of our data tables.

Download/View

Protecting and accessing water supply pipes

Developer services info sheet 2 - requirements for protecting and accessing water supply pipes.

Download/View

Cisterns for storing water and animal troughs

Developer services info sheet 3 - details for cisterns for storing water and animal troughs.

Download/View

Change of water source SRO research

Report covering findings on customers preferences towards changes to water resources – published June 2022

Download/View

Water Codes for adoption - local practices; consultation document

As part the upcoming Code for Adoption changes within the water industry each water company is required to publish and consult on any local practices which they wish to use rather than or in addition to the industry-wide standard practices.

Download/View

Making water count - our plan for 2020 to 2025 appendix A49

Appendix A49 Water resources annualised unit cost model

Download/View

RA01 - PR19 2020 to 2025 - Wholesale water base cost allowance

RA01 - PR19 2020 to 2025 - Wholesale water base cost allowance

Download/View

Water Resources Management Plan Cambridge Region - Annual Review 2017

Water Resources Management Plan Cambridge Region - Annual Review 2017

Download/View

SSC18c – Frontier Economics Impact of Covid19 on the water sector, Dec 2020

Report on the impact of Covid-19 on the water sector conducted by external company, Frontier Economics.

Download/View

SCC04c PR24 Data tables commentary – Costs (wholesale) water

A commentary on data in the ‘Costs (wholesale) water’ section of our data tables.

Download/View

SSC02 South Staffordshire Water – long term delivery strategy

SSC02 South Staffordshire Water – long term delivery strategy.

Download/View

Strategic regional water resources reconciliation model Dec 2020 v2

Strategic regional water resources reconciliation model Dec 2020 v2

Download/View

Design considerations for water supplies in apartment buildings and flats

This guidance is to help property developers and installers when designing water service layouts in multi-occupancy buildings such as maisonettes, apartment blocks and flats.

Download/View

SSC32 Long-Term Delivery Strategy climate change impacts on raw water quality technical report

Report on the impact of climate change on raw water quality in the long term (to 2050).

Download/View

Statement of final wholesale water charges and charges scheme 2020-2021

This charges scheme sets out our wholesale charges to provide water to a retailer. All charges are effective from 1 April 2020 to 31 March 2021, unless otherwise stated. Wholesale charges are the charges that retailers have to pay wholesalers for the provision of wholesale water services.

Download/View

SSC15 Your Water Your Say: You Said We Did

How feedback on our business plan gained in our ‘Your water, your say’ session has been incorporated into our final business plan.

Download/View

RA02 - PR19 2020 to 2025 - Addendum to Appendix A29 – Wholesale water enhancement cost allowance

RA02 - PR19 2020 to 2025 - Addendum to Appendix A29 – Wholesale water enhancement cost allowance

Download/View

Statement of final wholesale water charges and charges scheme 2021-2022

This charges scheme sets out our wholesale charges to provide water to a retailer. All charges are effective from 1 April 2021 to 31 March 2022, unless otherwise stated.

Download/View

Cambridge Water Stakeholder Roundtable

Report on findings from discussions with stakeholders about strategic options – published October 2021

Download/View

Wholesale charges scheme 2023/24

WRMP24 tables

WRMP24 - Appendix P5

South Staffs Water Stakeholder Roundtable

Report on findings from discussions with stakeholders about strategic options – published October 2021

Download/View

Water resources management planning (WRMP)

A comprehensive desk research review of WRMP 2019 up to 2020 to provide recommendations for how we should approach engagement for WRMP 2024 – published March 2021

Download/View

Barrier pipe information

Response to Household Call for Evidence

South Staffs Water's Response to Household Call for Evidence

Download/View

Wholesale charges scheme 2022/23

Statement of final wholesale water charges and charges scheme

Download/View

WRMP24 - Appendix G2

WRMP24 - Appendix P7

Water Framework Directive option level impact assessments

Download/View

WRMP24 - Appendix B5

Standard connection application

Making Water Count - our plan for 2020 to 2025

SSC31 Independent Challenge for South Staffs and Cambridge water

A report from the chair of our Independent Challenge Group who have challenged our business plan, customer engagement and long-term delivery strategy

Download/View

Customer Challenge Group Report

An assurance report for Our business plan provided to Ofwat by the CCG's Of South Staffs Water and Cambridge Water

Download/View

Business roundtable, Cambridge

Report covering findings the main barriers and motivators to supporting large water user businesses to save water - published March 2022

Download/View

PR19 Customer panel report

Customer panel report to accompany the PR19 Business Plan of South Staffs Water

Download/View

WMRP 2019 - Appendix X

Indicative Wholesale Charges Scheme 2021-22

Statement of indicative wholesale water charges and charges scheme 2020-2021

Download/View

Indicative Wholesale Charges Scheme 2020-21

Statement of indicative wholesale water charges and charges scheme 2020-2021

Download/View

Indicative Wholesale Charges Scheme 2019-20

Statement of indicative wholesale water charges and charges scheme 2019-20

Download/View

WRMP24 - Appendix B4

Water resources activity panel theme 1 - Strategic choices report

Download/View

WRMP24 - Appendix B7

Water resources activity panel theme 3 - deep dives report

Download/View

Non-standard connection application

Application for non-standard new water connections of 32mm or above

Download/View

Draft WRMP24 statement of response

Our draft water resources management plan 2025-2050 statement of response

Download/View

WRAP method statements

Further details about our Water Resources Advisory Panel

Download/View

Making water count - our plan for 2020 to 2025 appendix A01

Making water count - our plan for 2020 to 2025 appendix A02

Making water count - our plan for 2020 to 2025 appendix A03

Making water count - our plan for 2020 to 2025 appendix A06

Making water count - our plan for 2020 to 2025 appendix A07

Making water count - our plan for 2020 to 2025 appendix A08

Making water count - our plan for 2020 to 2025 appendix A05

Making water count - our plan for 2020 to 2025 appendix A13

Making water count - our plan for 2020 to 2025 appendix A13.1

Appendix A13.1 SSC Peer Review WtP Research Methodology by Ariel Bergmann

Download/View

Making water count - our plan for 2020 to 2025 appendix A13.2

Making water count - our plan for 2020 to 2025 appendix A14

Making water count - our plan for 2020 to 2025 appendix A14.1

Making water count - our plan for 2020 to 2025 appendix A14.2

Making water count - our plan for 2020 to 2025 appendix A18

Appendix A18 New connections market customer engagement

Download/View

Making water count - our plan for 2020 to 2025 appendix A25

Appendix A25 PR19 WRMP and WTP data triangulation study

Download/View

Making water count - our plan for 2020 to 2025 appendix A25.1

Appendix A25.1 PR19 WRMP and WTP data triangulation sheet

Download/View

Making water count - our plan for 2020 to 2025 appendix A25.2

Appendix A25.2 Triangulation Peer Review of Approach - Giles Atkinson

Download/View

Making water count - our plan for 2020 to 2025 appendix A25.3

Appendix A25.3 Triangulation Peer Review of Report - Giles Atkinson with PJM Final Response

Download/View

Making water count - our plan for 2020 to 2025 appendix A26

Making water count - our plan for 2020 to 2025 appendix A27

Making water count - our plan for 2020 to 2025 appendix A28

Making water count - our plan for 2020 to 2025 appendix A29

Appendix A29 Capital investment to deliver a class-leading service

Download/View

Making water count - our plan for 2020 to 2025 appendix A30

Making water count - our plan for 2020 to 2025 appendix A31

Making water count - our plan for 2020 to 2025 appendix A32.1

Making water count - our plan for 2020 to 2025 appendix A32.2

Making water count - our plan for 2020 to 2025 appendix A33

Making water count - our plan for 2020 to 2025 appendix A33.1

Making water count - our plan for 2020 to 2025 appendix A33.3

Appendix A33.3 Decision making framework model summary

Download/View

Making water count - our plan for 2020 to 2025 appendix A33.4

Making water count - our plan for 2020 to 2025 appendix A33.5.3

Making water count - our plan for 2020 to 2025 appendix A33.6

Appendix A33.6 Explain market research cost adjustment claim enagagement report

Download/View

Making water count - our plan for 2020 to 2025 appendix A33.8

Appendix A33.8 Cost adjustment claim proposed delivery timeline

Download/View

Making water count - our plan for 2020 to 2025 appendix A35

Making water count - our plan for 2020 to 2025 appendix A36

Making water count - our plan for 2020 to 2025 appendix A37

Appendix A37 WISER submission response (South Staffs incorporating Cambridge)

Download/View

Making water count - our plan for 2020 to 2025 appendix A38

Appendix A38 Board assurance of our PR19 business plan

Download/View

Making water count - our plan for 2020 to 2025 appendix A44

Appendix A44 PWC retail services efficiency benchmarking

Download/View

Making water count - our plan for 2020 to 2025 appendix A47

Making water count - our plan for 2020 to 2025 appendix A50

Making water count - our plan for 2020 to 2025 appendix A51

Making water count - our plan for 2020 to 2025 appendix A43

Making water count - our plan for 2020 to 2025 appendix A33.1.2

Making Water Count - our plan for 2020 to 2025 - September 2018

Our draft water resources management plan - customer summary

Non-technical summary document providing an easy-to-read overview

Download/View

Code of Practice for household customers 2023/24 - Water charges and bills

Our policy on charging and the scale of charges payable within the year

Download/View

Who's responsible leaflet

Our who's responsible leaflet explains who is responsible for water supply pipes, stops taps, water meters and sewerage and drainage pipes.

Download/View

Customer charges scheme 2019 - 2020

This Charges Scheme sets out our charges for water services and also those we collect on behalf of Severn Trent Water for wastewater services.

Download/View

Customer charges scheme 2021/22

This charges scheme sets out our charges for water services and also those we collect on behalf of Severn Trent Water for wastewater services.

Download/View

SSC06 Bidding framework

This bid assessment framework sets out guidance for third parties wishing to engage with South Staffs Water (incorporating Cambridge Water) about; providing a solution to a potential water deficit; making us aware of an innovation that will drive efficiency in the processes around producing and distributing water; making us aware of an innovation that will drive efficiency in water usage; and using our network to transport water.

Download/View

Here for you customer leaflet 2017

We're committed to providing high quality water, meeting your need and delivering great value for money. Read more about how South Staffs Water are here for you.

Download/View

Customer charges scheme 2020/21

This charges scheme sets out our charges for water services and also those we collect on behalf of Severn Trent Water for wastewater services. This scheme comes into effect on 1 April 2020.

Download/View

WMRP 2019 - Appendix N

WRMP Appendix N SSW Synthetic drought series and resilience of SSW Water Supply System

Download/View

Drought plan 2021 appendix E - pre-consultation response

A response from Water Resources West (WRW) advising its support in meeting the expectations of our drought plan

Download/View

WRMP24 - Appendix B6

Water resources activity panel theme 3 - deep dives online groups report

Download/View

SSC03 Fens Res – our approach into AMP8.

Our supporting information behind our plan to build a reservoir in the Fens in Cambridge with Anglian water.

Download/View

Code of Practice Addendum Document

This document details the South Staffs Water specific Code of Practice requirements under the WIRSAE scheme for Accredited Entities.

Download/View

Developer Service Charges 2019-2020

This document sets out and defines the way South Staffs Water (incorporating Cambridge Water) will charge developers for everything associated with new developments and new connections to our network. These charges cover the period from 1 April 2019 to 31 March 2020.

Download/View

Wholesale non-primary charges 2020-21

This document outlines the non-primary charges for use by licensed retailers in connection with services requested from South Staffs Water in support of the competitive retail market.

Download/View

Wholesale non-primary charges 2020/21

This document outlines the non-primary charges for use by licensed retailers in connection with services requested from South Staffs Water in support of the competitive retail market.

Download/View

Wholesale non-primary charges 2019 - 2020

This document outlines the non-primary charges for use by licensed retailers in connection with services requested from South Staffs Water in support of the competitive retail market.

Download/View

WRAP Deep dive Theme 3 forum

Report covering findings on customer preferences for universal metering programme and use of water transfers as a future supply side option - published November 2021

Download/View

Green recovery submission

Green recovery submission to year end 31 March 2024. Installing ceramic membrane filters at Hampton Loade water treatment works.

Download/View

Draft drought plan 2021 - summary

This summary of our draft drought plan sets out our plans to manage our water supplies in the event of a lengthy period of dry weather and a lack of rainfall. It tells you what we will do before, during and after a drought to ensure we can provide you with a secure water supply while minimising any impact on the environment. It also sets out how we will keep you informed of the measures we will put in place to protect your water supplies.

Download/View

Draft drought plan 2021

This drought plan describes how we will “…continue, during a period of drought, to discharge our duties to supply adequate quantities of wholesome water, with as little recourse as possible to drought orders or drought permits”.

Download/View

Drought Plan 2022

This drought plan describes how we will “…continue, during a period of drought, to discharge our duties to supply adequate quantities of wholesome water, with as little recourse as possible to drought orders or drought permits”.

Download/View

Statement of significant change to wholesale charges 2020-21

Under the wholesale charges scheme rules issued by the Water Services Regulation Authority (Ofwat), the Company is required to provide a statement summarising significant changes to 2020-21 wholesale charges.

Download/View

Wholesale Charges Scheme 2019 - 20

This charges scheme sets out our wholesale charges to provide water to a retailer. All charges are effective from 1 April 2019 to 31 March 2020, unless otherwise stated.

Download/View

Alternative credit support agreement

An agreement for alternative eligible credit support arrangement pursuant to Schedule 3 of the Business Terms contained within the Wholesale Contract dated 20th November 2017 and made under section 66E or section 117E of the Water Industry Act.

Download/View

Customer Charges Scheme 2023-2024

This charges scheme sets out our charges for water services and also those we collect on behalf of Severn Trent for wastewater services, with effect from 1 April 2023.

Download/View

WRAP Deep dive Theme 3 groups

Report covering findings on preferences for metering technology and tariff options in our South Staffs region and strategic water resource options in our Cambridge region - published February 2022

Download/View

Service connections user guide

This guide explains the process, timeframes, costs and relevant information that developer customers need to make a new service connection. A service connection is typically a small diameter (25mm) pipe which connects the supply from a property into the existing network of a water company.

Download/View